AC&E Logo NewsIcon.jpg Register for Newletters AC&E Phone number +44 (0) 1925 606400
  • EUR 5.1 million funding to develop tidal flow energy capture

    January 16th, 2020 by admin

    digital simulation of Minesto green technology 'kite'Leading marine renewable energy company Minesto, together with ac&e and other partners, received EUR 5.1 million, to develop Minesto’s Deep Green technology within a project named Powerkite. The project was financed through EU Horizon 2020.

    The Powerkite project continued development of a next generation power takeoff system (PTO) for a novel tidal energy device, the Minesto Deep Green subsea tidal kite. The objective was to enhance the performance of the PTO to ensure high survivability, reliability & performance, low environmental impact and competitive cost of energy.

    The Deep Green concept is to extract tidal energy by “flying” a turbine through water. The flow velocity through the turbine is an order of magnitude higher than for a fixed turbine and so the device can operate at relatively low velocity tidal flows, extending the ocean energy potential substantially. The turbine is mounted on a nacelle hung from a rigid wing and drives a generator to convert the tidal energy into electricity, which is transmitted along tether cables connecting this kite-like device to the seabed and then on via an electrical array sub-system to the grid.

    ac&e brought its expertise in CFD/FSI, hydrodynamics and system optimisation to develop a predictive modelling tool to quickly investigate kite configurations to maximise energy yield.

    ac&e’s partners consisted of Minesto, Chalmers University of Technology, Midroc Project Management AB, SSPA Sweden AB, Laborelec, UW-Elast, Moorlink Solutions AB and Queens University Belfast.  The project ran for 36 months.

    For additional information please email  anthony.mosquera@acel.co.uk

    This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 654438.
    Post Tags: , , ,
    Post ed in Design Engineering Simulation No Comments »

    Scalability, Service & Speed

    August 30th, 2017 by admin

    Remote computing is an established solution for teams that need access to shared applications. While ‘remote’ is often taken to mean off-premise, it can also refer to infrastructure that sits within the organisation. Read the rest of this entry »

    Post Tags: Post ed in IT Solutions/Facilities Management No Comments »

    ac&e AND NUMECA INTERNATIONAL ANNOUNCE NEW PARTNERSHIP

    July 17th, 2015 by admin

    UK pioneers in design and manufacturing simulation, ac&e, have entered a powerful partnership with Computational Fluid Dynamics (CFD) specialists NUMECA International. Headquartered in Brussels, NUMECA is a leading developer and provider of grid generation, multiphysics CFD and multidisciplinary (conjugate heat transfer, aero- and vibro-acoustics, fluid-structure interactions) simulation and optimization software for industrial products and processes. Through this new partnership, NUMECA announces an even greater consolidation of its presence on the world stage. Read the rest of this entry »

    Post Tags: Post ed in Manufacturing Simulation No Comments »

    World class facility shows ac&e flying with the best

    December 10th, 2014 by admin

    BAE Systems’ Hawk Synthetic Training Facility (HSTF) at RAF Valley provides a training facility for trainee pilots, instructors and air traffic controllers. The £60 million+ simulation facility operates at 99.86% availability, 14 hours per day and relies heavily on ac&e’s dedicated and bespoke support. Download the HSTF case study:

    Post Tags: Post ed in IT Solutions/Facilities Management No Comments »

    Remote Computing Enters New Era

    June 6th, 2014 by admin

    ac&e are proud to announce an exciting new partnership with NVIDIA, providing a ground-breaking remote modelling solution. NVIDIA are pioneers in visual computing and were the inventors of the graphics processing unit (GPU) – the engine of modern visual computing. Read the rest of this entry »

    Post Tags: Post ed in IT Solutions/Facilities Management No Comments »